ARC 3612 Project Management
Project 1 Defining and documenting a modular construction project
In a group of 7 people, each of the member should choose a role and work together to design and manage a simple construction project with the emphasize on COST, QUALITY, and TIME. The assesment is broken into two parts: 1) weekly mock Clien-Consultant Meeting (CCM) and 2) a report comprising the design, organizational chart, swot analysis, success criteria, work breakdown structure, gantt chart, risk analysis and maintenance proposal.
The requirement of the project is as such:
1) Maximum 5 storeys
2) Maximum land size 1000 sq m
3) Usage of a minimum of 50% recyclable products
4) Include rainwater harvesting system
Project 2 Documentation of a Medium-sized Project
This project is a documentation of Studio 6 Architecture Design Project in which principles learned from the previous project is applied.
From the point of view of a Project Manager as well as a Client, we are to write a document with 3 components in total:
1) Design Analysis - in which issues of PROGRAMME VIABILITY, DESIGN SUITABILITY, and MAINTENANCE STRATEGY are identified.
2) Risk Analysis and Mitigation Strategy - Achieve an identified SUCCESS CRITERIA and project deliverables.
3) Gantt Chart - showing overall construction strategy and possible critical path, plotted against time, with highlight on PROJECT DELIVERABLES.








Some of the minutes written during the CCM




Report