top of page

This is a project wihch is integrated with our Architectural Design Studio 2 project. In Studio 2 we made models of tea house. We would have to select 3 construction details we would be using for the tea house. One of the construction has to include the foundation. In my case, I used deep pile foundation as we would be building in cameron highlands where the soil is wet and not that supportive. The two other details I would be including are the floating stairs and the walls, which are to be made out of PVC glass. 

Project 2 - Integrated Construction Detailing and Drawing

 

Through this project I gained the ability of selecting suitable elements for the actual construction. I also gained knowledge of what foundation we should be using for what situation. 

SYLVIA KWAN 0311790

  • w-facebook
  • Twitter Clean
  • w-flickr
bottom of page